Tamalpais Drive/US 101 Overcrossing

Connecting East and West Corte Madera

Key Facts

Type: Class 1 multi-use path/freeway overcrossing
Location: Tamalpais Drive and US-101 Overcrossing in Corte Madera
Managing Agency: Caltrans
Cost: $45M (for full interchange project)
Funding: $3M (Corte Madera, 2025), $1.1 (TAM, 2023), $40M (Caltrans)
Status: In Design
Project Update: Project is finalizing design and permitting. Construction expected winter 2025 and will last approximately 1 year.

Benefits of the Project

This project will create a safe and separated multiuse path across US-101 for both bicyclists and pedestrians. Currently pedestrians have a long and difficult route using steep spiral ramps that are not ADA-compliant connected by narrow sidewalks. Bicyclists are forced to use paint-only bike lanes and cross busy on- and off-ramps.

By providing a multiuse path, all users will be able to safely travel from one side of the highway to the other.

What You Can Do

No further action needed.